Home | Articles | Links | Projects | Columns | Designs | Boat Index

Jon jr. Construction Sequience

jr01.jpg (16342 bytes)

Assembling the bulkheads. 
Me on the left, Dan observing

Lining up the bulkheads to see what the boat will look like

jr02.jpg (19236 bytes)
jr03.jpg (14822 bytes) The sides are clamped to the bulkheads

Gluing the side/bulkhead joint.

jr09.jpg (15245 bytes)

jr08.jpg (15291 bytes)

Screwing the sides to the bulkheads.

Screwing the gunwale to the sides.

jr05.jpg (13921 bytes)
jr12.jpg (18717 bytes) The hull mostly finished.

Painting

jr14.jpg (17499 bytes)
jr17.jpg (23982 bytes) Bye, bye.

 

Home | Articles | Links | Projects | Columns | Designs | Boat Index