| Part One - Part Two - Part Three It is now almost a year since I built the  boat shed, at the time I promised third article on how the project worked out  through rain, wind and snow.  My impetus  for building the shed was to have somewhere to construct my boat without paying  out a fortune for a factory made unit.   In part-1 of the article I explored the options and decided that almost all of them were  too expensive, and many of them too permanent for my needs. Part-2 detailed the construction of my own design   of boatshed and the design of the features I expected to need. Having  lived with the shed for almost a year I can report that it has lived up to my  expectations and more. There are a few minor modifications I would recommend,  depending on you location and climate, but the basic design and construction  has performed excellently.               The motivation in having two large doors at  the end was be able to get the boat out primarily, and as a secondary  consideration to provide extra ventilation, it didn’t turn out that way! If I  were building the shelter again from scratch I would have made a full set of  doors on both ends for ventilation as it got very hot in the sun. I peeled back  the top of the fixed end in the hottest part of summer (see picture below) but  it still was not quite enough.   Fortunately, this being England, the hot weather did not last too long.  In fact we have had one of the wettest years on record and there the shelter  did perform better than expected. It kept me and the boat dry with never a drop  of rain or condensation falling inside. The ventilated eves worked excellently,  giving just enough ventilation, in the correct place, to prevent condensation  on the roof, but at the same time make it snug inside at ground level, even  when it was windy. 
  
    |  | Note    the features in this photograph:- 
        End ventilation, top end peeled down for extra ventilation         here.Working bench to the side.Ground cover. |  The feature I was not sure of was the water permeable ground cover  membrane which gardening centres use to suppress weeds. My concern was that it  would not be suitable for working on and particularly sweeping up sawdust.  These concerns were completely unfounded, it worked far better than I could  have imagined. When the shed was constructed I cut the grass inside and pegged  the ground cover down, overlapping it down the middle, and holding it down with  large 6” wide wire staples. It has remained in position, with no grass growing  through it. The sawdust was easy to sweep up and keep clear. Working on it has  been easy and I have never slipped or tripped on it.               It lets moisture through so the ground  underneath does not become sour, I see a little condensation on the underside  of the dinghy where it is in contact with the ground, but resting the front end  of the dinghy on a block of wood cured this minor problem.   One of the features I was glad I had the  foresight to provide was the work bench down the side, ‘What work bench?’ you  ask. I know it doesn’t look like one but the bits of wood sticking out on the  right hand side with some angled supports below them. Their lack of  sophistication suggests a similar lack of utility, but don’t believe it they are  the perfect place to work on scarf joints for the side and bottom battens. A  good place to store wood and – with the addition of a piece of plywood - a good  place to rest tools.  What’s more they  don’t take up much space at 14” long, and with the bracing are so sturdy that I  have even used them as a foot rest on my way down from the top of the boat. 
  
    |  | View    of the workbench. Note the extra ventilation has been closed up again as this    picture was taken in the snow. |  Wind in moderation did not seem to bother  the structure too much, it rattled the roof as it came through the ventilation  slots at the top of the gable ends but no damage was done to the polythene,  despite the fact that it was only fastened at the ends, like an agricultural  polytunnel.  The only damage done was  when the wind came from the back end and blew the front doors open, the  retaining wires snapped and one door suffered a broken bottom rail. Which was  surprisingly little, considering how large they are and how flimsy the  construction. This was easily repaired with a secondary batten and a few  screws. Needless to say I retained them better with some thicker wire after  that.               At present we have about 4” of snow on the  roof. I went inside and tapped the roof with a broom to encourage the snow to  slide off. Even though I know it will take a foot of snow or more, as the  polythene has a five years guarantee, and the structure is strong because I  have swung off it before now. This is my standard test I apply to most things,  even picture hooks, if it can take my weight it will do the job. 
  
    |  | The    present situation, waiting for warm weather to continue with the boat building. |  Pros 
              Cheap to buildEasy to construct to size requiredWeather proofWarm in wind and rainNo drips from the roof, probably due to       ventilation on eaves Cons 
              Very hot when the sun shinesDoors can catch the wind Advice 
              Leave room for a side bench for mast       building, scarf jointing, etcHave some permanent ventilationMake a small door for everyday useMake main doors on both ends if you       anticipate any serious warm weatherHave a helper to make the build go quicker       (my only ones were the bricks with holes) Click HERE for a list of articles by Mike Machnicki |